Skip to content
S&G Cleaning YYC

Post-Construction Cleaning

From site to showroom

Construction dust is not ordinary dust. It settles for days, it gets into tracks and vents, and it will ruin a normal clean if it is not dealt with in the right order.

We work in passes — coarse debris first, then fine dust from the ceiling down, then a final floor clean once the trades are genuinely finished.

What's included

The checklist our crew works from

This is the actual scope. If something you need is not on it, ask — most things can be added.

Scope

  • Fine construction dust removed from all surfaces
  • Stickers, adhesive, and paint spots removed from glass and fixtures
  • Inside cabinets, closets, and appliances
  • Windows, tracks, and frames detailed
  • Vents and returns vacuumed
  • Final floor clean once trades are finished

Book your post-construction

Tell us about the site and we will get back to you within two business days.